
By Rosalind Russell – Nickel Belt MPP France Gelinas says she has received a letter from Steve Lecce, the Minister of Energy and Mines outlying the work being carried out at the Agnew Lake Tailings site.
Gelinas says she asked him for a clear timeline to repair the eroded cover at the Agnew Lake Tailings site, where the Canadian Nuclear Safety Commission identified elevated radiation levels in areas where uranium tailings have become exposed.
She says residents of Nairn and Hyman Township, as well as Baldwin Township, have been raising concerns about their health, drinking water, animals and the environment.
Lecce says several steps have already been taken including an inspection of the mine site, groundwater and other testing, a dam safety review, roadwork, and targeted radiation surveys.
Although he did not provide a timeline, he says once the contract requirements are met, the work will get underway adding all legislated licencing and regulations are being followed.
Studies and possibly some work is expected to be carried on an adjacent site next year.
Photo: Agnew Lake Mine site – uer.ca

Submit News Tip